Scroll Top
concrete pour

Concrete Poured in Lower Level

Another step closer to lower level walls going up!

2015-05-20-Concrete pour LL- WHCMA
This morning the concrete truck was at 328 Shrewsbury Street bright and early.  The drain trenches are being filled.

2015-05-19 Procedure Room Plumbing WHCMA
First Floor Procedure Room plumbing coming along.